[TEST] Family House – Teplice
[TEST] Rooftop photovoltaic system installation with three-phase inverter, battery storage and main distribution board adaptation.
View projectWe supply and install systems engineered to operate together within low-voltage networks up to 1 kV (TN-C-S earthing system). Every air-to-water heat pump is paired with feeder circuits sized to its load, and every photovoltaic installation includes an inverter, protection and grid connection matched to actual consumption.
We serve family houses, apartment renovations and new builds [TEST] across the Ústí nad Labem Region, Central Bohemia and Prague. Every installation is handed over with as-built documentation and a handover protocol; initial inspection is provided by an independent certified inspector.
We design and execute residential energy and low-voltage systems up to 1 kV (TN-C-S earthing system) engineered to work together.
Supply and wiring of air-to-water heat pumps including feeder sizing, overcurrent protection and ripple control (HDO) in the main switchboard.
Explore serviceInstallation of photovoltaic systems with three-phase inverter, battery storage, SPD surge protection and metering adaptation.
Explore serviceComplete low-voltage power and data wiring, distribution boards and readiness for heat pumps, PV and EV charging stations in new builds.
Explore serviceReplacement of legacy aluminum wiring with copper in a TN-C-S system, switchboard upgrades and enhanced protection against electric shock.
Explore serviceExamples of completed and handed-over installations with full as-built documentation.
[TEST] Rooftop photovoltaic system installation with three-phase inverter, battery storage and main distribution board adaptation.
View project[TEST] Complete power and data electrical installation in a new family house (TN-C-S system) including heat pump and EV readiness.
View project[TEST] Air-to-water heat pump installation including main switchboard modification, SPD surge protection and HDO ripple control wiring.
View projectSend us basic details about your building and required scope of work. We respond within two business days.