Indicative Price List [TEST]
All listed rates are indicative starting prices excluding VAT valid from [TEST] November 1, 2026 [DOPLNIT: actual price list validity date] and provide an initial baseline prior to an itemized quotation following an on-site survey.
Air-to-Water Heat Pumps
| Item | Unit | Price from (excl. VAT) | What affects the price |
|---|---|---|---|
| Supply and installation of an air-to-water heat pump including hydromodule connection [DOPLNIT: brands] | set | [TEST] 185,000 CZK [DOPLNIT] | Building heat loss, target seasonal coefficient of performance (SCOP), bivalent source and piping length |
| Distribution board adaptation, overcurrent protection and ripple control (HDO) preparation | circuit | [TEST] 12,500 CZK [DOPLNIT] | Condition of existing switchboard, main connection capacity and cable run length |
Photovoltaics (PV Systems)
| Item | Unit | Price from (excl. VAT) | What affects the price |
|---|---|---|---|
| Photovoltaic system with three-phase inverter without battery storage [DOPLNIT: brands] | system | [TEST] 165,000 CZK [DOPLNIT] | Installed capacity in kWp, roof covering type, pitch and DC cable routing |
| Photovoltaic system with three-phase inverter and battery storage [DOPLNIT: brands] | system | [TEST] 245,000 CZK [DOPLNIT] | Battery storage capacity in kWh, metering switchboard adaptation and surge protection (SPD) |
Electrical Installations (New Builds & Renovations)
| Item | Unit | Price from (excl. VAT) | What affects the price |
|---|---|---|---|
| Complete electrical installation for a new family house (LV up to 1 kV, TN-C-S system) | building | [TEST] 140,000 CZK [DOPLNIT] | Number of circuits, low-current wiring scope, number of switchboards and external influences |
| Apartment electrical rewiring (transition to TN-C-S system, new distribution board with RCDs) | apartment | [TEST] 68,000 CZK [DOPLNIT] | Wall material (precast concrete / brick), number of circuits and phased execution |
| Assembly and wiring of main or sub-distribution board (RCD, SPD, protection selectivity) | board | [TEST] 18,000 CZK [DOPLNIT] | Number of DIN modules, short-circuit rating and required IP ingress protection |
| Dedicated feeder circuit and protection for an EV charging station | circuit | [TEST] 9,500 CZK [DOPLNIT] | Main connection value, conductor cross-section and distance from switchboard |
Site Visit & Transport
| Item | Unit | Price from (excl. VAT) | What affects the price |
|---|---|---|---|
| On-site technical survey and measurement prior to itemized quotation | visit | [TEST] 1,500 CZK [DOPLNIT] | Deducted from the final invoice upon project execution |
| Transport of materials and installation crew to the construction site | 1 km | [TEST] 18 CZK [DOPLNIT] | Actual travel distance to the site [DOPLNIT: service radius] |
What Affects the Final Price
Number of circuits and switchboards – total count of protected lighting, socket and appliance feeders, residual current devices (RCD) and surge protection devices (SPD).
External influences and IP rating – requirements for equipment protection in utility rooms, bathrooms and outdoor areas in accordance with ČSN standards.
Site access and structural readiness – wall material (concrete, brick, drywall), cable route lengths and single-stage vs. phased execution.
Documentation scope – preparation of as-built documentation and handover protocol matching the complexity of the installation.
Main connection capacity and service line – condition of the existing grid connection, protection selectivity and potential metering board modifications.
Frequently asked questions on pricing & execution
How long does the on-site installation take?
[TEST] Installing an air-to-water heat pump or photovoltaic system typically takes 2 to 4 business days depending on switchboard and cable route readiness. Apartment rewiring takes 5 to 10 business days, while new family house installations proceed in two stages (rough-in and final assembly) aligned with the construction schedule.
Is a three-phase connection required for a heat pump and photovoltaics?
For most residential air-to-water heat pumps and three-phase PV inverters, a three-phase connection in a TN-C-S earthing system with an adequate main circuit breaker rating is required. Prior to design, we verify the main breaker rating, main service line cross-section and protection selectivity.
Can a photovoltaic system be installed without battery storage?
Yes, a photovoltaic system can operate with direct on-site consumption and water heating or export control, including structural and electrical readiness for future battery storage expansion. The optimal setup depends on your daily load profile and grid operator connection terms.
Do you perform electrical inspections?
No, initial inspection is provided by an independent certified inspector. Our delivery includes installation compliant with ČSN standards, as-built documentation and a handover protocol prepared for the independent inspection report.
Request an installation quote or technical consultation
Send us basic details about your building and required scope of work. We respond within two business days.