[TEST] Two-storey family house – [TEST] Litoměřice
[TEST] Air-to-water heat pump installation including main switchboard modification, SPD surge protection and HDO ripple control wiring.
Project Parameters
Project Specifications
- Scope of Work
- [TEST] Installation of air-to-water heat pump and indoor hydromodule; [TEST] Main switchboard upgrade (RCD, SPD, overcurrent protection); [TEST] Wiring of HDO ripple control and bivalent heat source
- Year
- 2026
- Location
- [TEST] Litoměřice
- Property Type
- [TEST] Two-storey family house
- Included in Delivery
- [TEST] Outdoor and indoor air-to-water heat pump units, power feeder, TN-C-S protection components, as-built documentation and handover protocol (initial inspection by an independent person).
Project photo documentation
On-Site Process
Execution Summary
[TEST] The first stage covered verification of the main connection capacity and modification of the TN-C-S distribution board for dedicated compressor and bivalent source protection. Subsequently, the outdoor unit and indoor hydromodule were installed and handed over with as-built documentation and a handover protocol.
Get in Touch
Request an installation quote or technical consultation
Send us basic details about your building and required scope of work. We respond within two business days.