[TEST] Apartment in a brick residential building – [TEST] Děčín
[TEST] Phased electrical rewiring of a 3-bedroom apartment transitioning to a TN-C-S system with a new RCD-protected switchboard.
Project Parameters
Project Specifications
- Scope of Work
- [TEST] Complete replacement of aluminum wiring with copper in a TN-C-S system; [TEST] Installation of new apartment switchboard with RCDs and SPD; [TEST] Supplementary protective bonding and dedicated appliance circuits
- Year
- 2025
- Location
- [TEST] Děčín
- Property Type
- [TEST] Apartment in a brick residential building
- Included in Delivery
- [TEST] Legacy wiring removal, new copper circuits, apartment switchboard with RCD and SPD, wiring accessories, as-built documentation and handover protocol (initial inspection by an independent person).
Project photo documentation
On-Site Process
Execution Summary
[TEST] The renovation was executed in two stages (bathroom core, kitchen and new switchboard first, followed by living rooms). After installing all outlets, switches and protective bonding, as-built documentation and the handover protocol were handed over.
Get in Touch
Request an installation quote or technical consultation
Send us basic details about your building and required scope of work. We respond within two business days.